change-order
connectsmcp.zovo.one
Change orders against a quote or work order: deltas, approval, running contract value.
https://mcp.zovo.one/mcp/change-orderWebsiteOAuthMCP 2025-11-25v0.22.6last checked 22 Oct 2026spoke MCP on 100% of 89 checks (30 days)initialize in 689 msLast checked 22 Oct 2026
- ✓Answered the MCP handshake (MCP 2025-11-25)
- ✓Auth detected: OAuth
- ✓Lists 11 tools
- ✓No blockers or warnings
- ✓Spoke MCP on 89 of 89 checks (30 days)
Will my client connect?
Decided from what the probe found at the endpoint, and from what each client's own documentation says it can complete. Every row carries the day that documentation was read.
✓Claude CodeConnects
The authorization server advertises RFC 7591 registration, so Claude Code can register itself and sign you in through the browser.
claude mcp add --transport http change-order https://mcp.zovo.one/mcp/change-orderClaude Code docs · read on 2026-08-30
✓Claude (claude.ai & Desktop)Connects
The authorization server advertises RFC 7591 registration, so Claude (claude.ai & Desktop) can register itself and sign you in through the browser.
Settings → Connectors → Add custom connector, then paste https://mcp.zovo.one/mcp/change-order.
Claude (claude.ai & Desktop) docs · read on 2026-08-30
✓ChatGPTConnects
The authorization server advertises RFC 7591 registration, so ChatGPT can register itself and sign you in through the browser.
Settings → Apps → Advanced settings → Developer mode, then create a connector pointing at https://mcp.zovo.one/mcp/change-order.
ChatGPT docs · read on 2026-08-30
✓CursorConnects
The authorization server advertises RFC 7591 registration, so Cursor can register itself and sign you in through the browser.
{
"mcpServers": {
"change-order": {
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}Cursor docs · read on 2026-08-30
✓VS Code (Copilot)Connects
The authorization server advertises RFC 7591 registration, so VS Code (Copilot) can register itself and sign you in through the browser.
{
"servers": {
"change-order": {
"type": "http",
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}VS Code (Copilot) docs · read on 2026-08-30
How to authenticate
Checked against the endpoint by our probe on 22 Oct 2026. These are the capabilities the server advertises, not a prediction about any particular client.
| Scheme | OAuth |
|---|---|
| Issuer | https://mcp.zovo.one |
| Dynamic client registration | ✓Advertised (RFC 7591) |
| Client ID Metadata Document | ✕Not advertised |
| PKCE | ✓S256 |
| Grant types | authorization_code |
| Scopes | mcp:connect |
| Protected-resource metadata | ✓Published (RFC 9728) |
| Anonymous access | Handshake succeeds; 11 tools listable |
| Documentation | https://mcp.zovo.one/guides/mcp-server-free-vs-pro |
What the probe found
A cross-origin preflight came back without Access-Control-Allow-Origin, so the endpoint is reachable from native clients only — code running in a web page is stopped by the browser before a request is ever sent.
The server exposes a public surface before authorization: change_order_create, change_order_add_line, change_order_status, change_order_get, change_order_list, change_order_delete, contract_value, change_order_document, change_order_invoice_payload, license_status, license_activate.
Tools
Contract history
Instructions rewritten: license_activate. The description an agent follows changed; the callable contract may not have.
Instructions rewritten: change_order_delete, change_order_get, change_order_list, change_order_status, contract_value, license_activate, license_status. The description an agent follows changed; the callable contract may not have.
Watch this server
Save its public contract as a baseline and manage breaking-change email alerts.
Set up a watchRoute it through the gateway
Put this endpoint behind one find_tools / call_tool pair with the rest of your servers. Part of Pro.
Add to my gatewayOwn this server?
Sign in to claim this listing by proving control of its host.
Status badge
Status for a README, from the last probe — cached an hour, so up to seven hours behind the endpoint. Links back to this page.
[](https://mcpi.app/servers/change-order)